Construction and installation works on the object: "TESC-6. Site of shipment of finished products. Small loading overpass. Span L-M, axles 53-112". 1. Dismanting/installation of flyover, dismantling of reinforced concrete structures
2. Installation of tethers
3. Priming, painting of metal surfaces
4. Device of foundations
5. Flooring deviceCollapse
OKPD2 category:
Show all (9 more)
23.61.12.111 Блоки фундаментов железобетонные
23.61.12.113 Плиты фундаментов железобетонные
23.61.12.119 Конструкции фундаментов сборные железобетонные прочие, не включенные в другие группировки
42.21.22.190 Работы строительные по прокладке местных трубопроводов прочих жидкостей и газов
43.29.19.190 Работы монтажные прочие, не включенные в другие группировки
43.99.30.000 Работы свайные; работы по строительству фундаментов
43.99.40.130 Работы по укреплению фундаментов
43.99.50.140 Работы взаимосвязанные сварочные
43.99.70.000 Работы по сборке и монтажу сборных конструкций
43.99.90.190 Работы строительные специализированные прочие, не включенные в другие группировки
43.99.30.100 Работы свайные; работы по строительству фундаментов, кроме работ на объектах культурного наследия
43.99.30.200 Работы по ремонту, реставрации, консервации и воссозданию оснований и фундаментов на объектах культурного наследия
Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Ranking of bids
In the course of bidding, a price-based rank (position) shall be assigned to a quotation.
Assignment of the 1st rank (position) to a bid does not imply the bidder's winning, but enhances the bid's preferability for the Buyer when selecting the winner, all other factors being equal.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
In calls for bids with bids ranking, bid submission deadline will automatically be extended in the same manner if the rank of a bidder changes.
:
30 minutes
Payment terms:
Payment is desirable within 30-90 calendar days from the moment of signing the act of performed works, at advance it is necessary to provide a bank guarantee (list of banks in Appendix 5 Procurement documentation).
Delivery terms:
Terms of services: until 30.09.2021.
1. ATTENTION! If your organization is not accredited by the CTPH Group, it is necessary to apply for accreditation at the following address: https://chelpipe.ru/suppliers/pipe-division/accreditation/
Accreditation is given for a year. A non-accredited participant is not automatically allowed until participation in the procurement procedures of the CTPZ Group and prior to the conclusion of the contract (s).
2. Be sure to visit the site of the Customer and inspect the subject of works/services before submitting an application for participation in the purchase!!!
3. Compulsory development and coordination of the EDS, the schedule of work production (before the start of work);
4. Supply of materials by the Contractor.
5. Payment is desirable within 30-90 calendar days from the moment of signing the act of performed works, at advance it is necessary to provide a bank guarantee (list of banks in Appendix 5 Procurement documentation).
6. Calculation of the contract value is performed by the resource method (the cost of resources must correspond to the value declared by Chelinformcenter)
7. A coefficient taking into account the conditions of work in the amount of 1.15 is applied in the estimates. When calculating the cost of works at current prices, a refund for the use of the customer's energy resources is applied in the amount of 1.93% of the cost of the CMP.
8. Conclusion of a contract in the form of Annex 5 Procurement documentation
9. Compliance with measures to prevent the spread of coronavirus infection:
- All employees of the contracting organization must be provided with PPE, mask respirators, daily body temperature control (thermal imagers are installed at the checkpoint), as well as disinfection hands with an antiseptic, located on the passage at each entrance to the territory of the enterprise;
- observe the masky regime throughout the territory of enterprises (work, movement on foot, by car).
Georeferencing:
454129, Russia, Chelyabinsk Region, St. Chelyabinsk str. Mashinostroitelov, 21
Comments: 1. ATTENTION! To participate in the procedure MUST apply for accreditation at https://chelpipe.ru/suppliers/pipe-division/accreditation/. Without accreditation, the application for the company's participation in the procedure will not be considered.
2. Registration and submission of applications by participants at the B2B - Center site is free of charge. Electronic digital signature is not required. If you have any questions about registration and placement of applications, please contact the.8 (495) 989-85-19 do.7610; 8 (800) 555-85-19.
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
Контактная информация Организатора:
Павлова Наталья Викторовна
Менеджер управления закупки услуг
Тел. +7-351-255-73-33 доб. 36229, сот. +7-982-100-23-78 natalya.pavlova@chelpipegroup.com
Контактная информация технического специалиста:
Ведущий инженер (строительного контроля общестроительных работ и монтажаоборудования)
Назаров Александр Петрович
8 (351) 255-73-33 доб.37907, сот. 8 951 477-82-33
aleksandr.nazarov@chelpipegroup.com
Требования к поставщику:
1. Опыт работы в данной специализации. 2. Наличие документов, подтверждающих аттестацию ответственных лиц за безопасное производство работ по охране труда, промышленной и пожарной безопасности, электробезопасности, согласно Приказу 233 от 06 апреля 2012 Федеральной службы по экологическому, технологическому и атомному надзору 3. Собственная материально-техническая база, необходимая для выполнения данных работ
Требования к материалам:
Поставка материалов Подрядчиком.
Требования к документации:
Состав документов в заявке (обязательны для предоставления!!!):
1.Коммерческое предложение (по форме Приложения 2 Закупочной документации (далее - ЗД)
2.Уставные документы (Устав, Протокол о назначении директора, Свидетельство о гос.регистрации юр.лица, Свидетельство о постановке на учет в налоговом органе, актуальная Выписка из ЕГРЮЛ) – для участвующих в тендерах ЧТПЗ впервые
3.Анкета (по форме Приложения 3 ЗД).
4.Справка по технике и оборудованию, необходимых для выполнения комплекса работ (по форме справок 3.1, 3.2 в Приложении 3 ЗД).
5.Справка по опыту проведения подобных работ (по форме справки 4.1 в Приложении 3 ЗД)
6.Справка по кадровому составу предприятия (по форме справки 2.2 в Приложении 3 ЗД)
7.Сканы всех квалификационных документов (согласно квалификационных требований к поставщику – указаны в Извещении в разделе «Квалификационные требования к поставщику»).
8.Бух.баланс за 2020г. с отметкой/квитанцией о получении
Документы предоставить в формате PDF!