Per-item bid submission: | Not applicable. Proposal shall cover the entire lot. |
Restriction on submission of a bid higher than previously submitted Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased. : | Yes |
Upload of bid-related documents required Bids not supported with documentation will not be considered. : | Yes |
Ranking of bids In the course of bidding, a price-based rank (position) shall be assigned to a quotation.
Assignment of the 1st rank (position) to a bid does not imply the bidder's winning, but enhances the bid's preferability for the Buyer when selecting the winner, all other factors being equal. : | Yes |
Auto-extension If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
In calls for bids with bids ranking, bid submission deadline will automatically be extended in the same manner if the rank of a bidder changes. : | 30 minutes |
Payment terms: | 1. Payment is desirable within 30-90 calendar days from the date of signing the certificate of completion, with an advance payment it is necessary to provide a bank guarantee (list of banks in Appendix 4).
2. Acceptance of works is made once upon completion of works. The Contractor, no later than the 25th day of the reporting month, submits for consideration to the Customer for verification and signing a report on the results of the provision of services, an act of acceptance of services rendered and other necessary documentation and an invoice of the standard established in the Russian Federation. |
Delivery terms: | 1. Scope of work - In accordance with the terms of reference (Appendix 1). The technical requirements and detailing of the units / parts of the converter housing are specified in the attached design documentation (Appendix 1.1.).
2. Terms of work: end of August - November 2020
3. The commercial offer is accepted only according to the attached form (Appendix 2).
4. Equipment and materials included in the Customer's area of responsibility:
a. Parts and accessories of the converter according to the design documentation 800.33.000 СБ;
b. Welding consumables: - Nittetsu 16W electrodes - 11,000 kg.
c. Hoisting mechanisms (bridge crane Q = 40 / 10t, Q = 32 / 8t) for assembly of converter units;
d. Converter assembly area.
4. Equipment and materials included in the area of responsibility of the organization assembling the converter:
a. Lifting devices for handling assembly work;
b. Welding equipment;
c. Geodetic equipment;
d. Assembly tools;
e. Converter stand and fixtures;
5. Compliance with measures to prevent the spread of coronavirus infection:
- Work must be carried out by employees who are not in the "risk zone" (up to 60 years old),
- Employees working on the territory of PJSC "ChTPZ" must be citizens of the Russian Federation, residents of the Chelyabinsk region, or go through a two-week quarantine after arriving in the Chelyabinsk region from another region before starting work with the provision of supporting documents (travel tickets, rental contracts, etc.). ), or present a document confirming the passage of a coronavirus test no older than three days.
- All employees of the contractor must be provided with PPE, respirator masks, undergo body temperature control on a daily basis, and also disinfect hands with an antiseptic located at the checkpoint at each entrance to the territory of the enterprise;
- observe the mask regime throughout the territory of enterprises (work, walking, by car);
- keep a "social" distance of 1.5 m. when moving around the territory of enterprises. |
Georeferencing: | - 454129, Russia, Chelyabinsk Region, St. Chelyabinsk str. Mashinostroitelov, 21
- Chelyabinsk region, Chelyabinsk, Lenin district |
Comments: Supplier qualification requirements:
The organization must be an active member of the SRO and have the 1st level of responsibility for ensuring contractual obligations (ALC).
The organization and personnel carrying out the installation of the converter housing must be certified:
1. Welders performing welding and welding production specialists who carry out guidance and technical control must be certified in accordance with the requirements of PB 03-273, RD 03-495 for the group of technical devices "Metallurgical equipment".
2. Equipment and welding technology must be certified in accordance with the established procedure in accordance with the requirements of RD 03-614, RD 03-615 for the group of technical devices "Metallurgical equipment"
3. Certification and certification of a slinger and crane operator with the right to control the PMG from the floor (to the radio channel).
4. Certification of labor protection specialists.
5. Experience in carrying out similar works. |
Venue of bidding: | This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document. |
Контактная информация технического специалиста: | Директор по производству ООО «Этерно
Кузьмин Ярослав Владимирович
Тел. 8 (351) 200-63-93 доб.47013
yaroslav.kuzmin@chelpipegroup.com |
Контактное лицо: | Паршиков Вячеслав Александрович
Менеджер управления закупки услуг
т. +7 351 255 68 03;
т. +7 950 737 77 29