Before qualifying suppliers, without specifying the price. CMP for the task "Engineering Center UPDSA. Laboratory shaking powertrain components and systems in the shell 50», «Engineering Center UPDSA. Placement and connection of fast gas Analyzer...
Before qualifying suppliers, without specifying the price. CMP for the task "Engineering Center UPDSA. Laboratory shaking powertrain components and systems in the shell 50», «Engineering Center UPDSA. Placement and connection of fast gas Analyzer HORIBA in chassis 50 "according to developed projects: Schedule 378072225.3-50-ОВ2 installation of a forced-air ventilation and conditioning in 22-24 axles/a-b, 2225.3-50-VSV42 connection of equipment to the network of compressed air, 2225.3-50-incl. 3 connect equipment to networks, 2225.3-50-incl. 4 condensation from air conditioning systems, 2225.3-50-PTVl1-3 Installation AUPT axes 22-24/a-b, 2225.3-50-Personal-4-15 civil works, 1540-50 COP l. 2 (4) l. 17 (3), l 40 (1). 2225.3-50-JeO2 Installation work and emergency lighting 2225.3-50-Em2 E. connect fan Of172, split-systems of K1-K4, fire retardant valves-YA1 YA5. Lock with 2225.3-50. AUPT-JeM3, JeM3 (izm1) Electr.connect. equipment and network wall outlet 22 axes-24/a-b, 2225.3-50-JeG2 lightning protection device of outdoor units of split-systems K1-K4, 2225.3-50-PS1 Alarms from fire-extinguishing installations and Pur-381181540-50 Schedule, GP19 GP19 (izm1) Accommodation Cabinet installations, 2225.3-50-KS l. 2 construction works, 1540-50-COP l. 222-raboty1540 Construction 50-SG4 SG4, (with izm1) specgazov Pipeline Tracing, PU-n 09.445.000 SA (izm1) device for storage of bottles. Execution of commissioning works project should be : 2225.3-ОВ2-50, 2225.3-50-Em2, 2225.3-50-PS1, 2225.3-50-PTV l. 1-3. Always make sure the contractor's questionnaire Appendix No. 1. CMP CMP to perform work on the task "Engineering Center UPDSA. Laboratory shaking powertrain components and systems in the shell 50», «Engineering Center UPDSA. Placement and connection of fast gas Analyzer HORIBA 50 in the chassis. (Buying)Collapse
Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
form of payment is cashless settlements within 5 banking days upon the expiration of 60 days from the date of payment documents to the Directorate of finance JSC "AUTOVAZ".
Comments: , Equipment according to the specification in its entirety comes contractor organization. A decision on choosing a seller accepts a tender Committee JSC "AUTOVAZ".
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.