The right to conclude an agreement for works on author's control of the developer of the regulator ARMR and PTK SGIU during the preparation of materials and testing of the operating modes of power unit No. 1 of Leningrad NPP-2 in the daily...
Works on the author's control of the Developer of the regulator ARMR and PTK SGIU during the preparation of materials and testing of the operating modes of power unit No. 1 of Leningrad NPP-2 in the daily schedule of load changes with an extended pressure rangeCollapse