an open one-stage RFP without pre-qualification for the right to conclude a contract for execution of CONSTRUCTION on the project construction of the SUBSTATION 110/10 kV Backbone, 110 kV HV LINE l. Borova-2, l. Trunk-1 from the existing 110 kV...
an open one-stage RFP without pre-qualification for the right to conclude a contract for execution of CONSTRUCTION on the project construction of the SUBSTATION 110/10 kV Backbone, 110 kV HV LINE l. Borova-2, l. Trunk-1 from the existing 110 kV HV LINE l. Borova-2 and outgoing lap 10 kV for power supply of technological connection objects magistral LLC two capitals (BRTP No. 198 a, no. 199 BRTP) (installation of power transformers 2 2.5 MVA, building plot dvuhcepnogo VL-110 kV with a length of 1 km, construction of VL-10 kV with a total length of 20 km) "(IE # 000000-63-2-03.13-4123) reconstruction of the 110 kV HV LINE PROTECTION l. Borova-2 kV 110/10 SUBSTATION on the meat for the needs of affiliate Milletgrass PJSC mrsk of North-West" novgorodenergo " for the needs of the CONSTRUCTION Execution branch of PJSC «mrsk of North-West "novgorodenergo"Collapse
OKPD2 category:
42.2 Сооружения и строительные работы по строительству инженерных коммуникаций
Not applicable. Proposal shall cover the entire lot.
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Supplier should not be recorded in the register of mala fide suppliers
The Organizer has set a requirement as to the supplier's not being recorded in the register of mala fide suppliers. Supplier's compliance with this requirement shall be checked by the Organizer on their own.
:
Yes
Participation of small and medium businesses
Organizer has initiated the bidding only for small and medium businesses to participate. Verification of compliance with the criteria for being qualified as small and medium businesses is to be performed by the organizer.
:
Участниками данной закупки могут быть только субъекты малого и среднего предпринимательства
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
the customer is obligated to make payment within 30 calendar days from the date of signing by the parties of the Act of acceptance of the executed works (Act on form No. COP-2) during the reporting period and cost of work performed and costs (form # KS-3) or from the moment of signing Parties Act of acceptance of completed construction project acceptance Committee (Act on form No. COP-14) and based on the invoice-an invoice drawn up in accordance with the requirements of the tax code of the Russian Federation.
More detailed payment terms are indicated in Annex No. 2 to the procurement documentation.
Delivery terms:
term of execution of works:
start of works-April 2018 year
the end of execution of works-June 2018 year
Place of work:
In accordance with customer specifications (annex 1 to the procurement documentation)
Venue of bids examination:
г. Великий Новгород, ул. Большая Санкт-Петербургская, д.3
Date and time of bids consideration:
12.04.2018 16:00
Results date and time:
16.04.2018 16:00
Georeferencing:
173000, Россия, Новгородская область, г. Великий Новгород, ул. Большая Санкт-Петербургская, д.3
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Procurement documents provision procedure:
Procurement documents in electronic form are available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date of publication of the procurement procedure.