Request for Proposals No. 1021533 
Purge neftegazosbornogo pipeline AGZU August deposits-hive 4 Kochevnenskogo deposits (du 8 × 219 mm, 32 km) with internal polymer coating-epoxy and protective sleeves weld "Celer" in accordance with Rd-39-132-94.

No.NameQuantityUnit of measurePer unit price
(show both prices)
Total limit price
(show both prices)
11 step-skipping ibox, the solid polyurethane treatment scraper with transmitter and control its movement at the control (marker) points32кмPrice not specifiedPrice not specified
22 stage admission ibox, the solid polyurethane treatment scraper with transmitter and control its movement at the control (marker) points32кмPrice not specifiedPrice not specified