Request for Proposals # 3680718
Cable and conductor products
Cable and conductor
| Current | MANGAZEYA MINING LLC | 07.06.2024 16:00 |
Request for Proposals # 3680779
Technological equipment
Kilns for firing
Furnaces for roasting ore
| Current | MANGAZEYA MINING LLC | 07.06.2024 16:00 |
Request for Proposals # 3679063
... Expand
Execution of works on technical re-equipment of the boiler house with an installed capacity of 12.3 MW at the facility: "Mining processing enterprise based on the gold deposit "Nasedkino". Reconstruction. The output capacity is 1.9 million tons per year."
1. Dismantling of equipment.
2. Installation of two boilers KVm-3.5KB with a total capacity of 7 MW, thermal mechanical equipment of the boiler, plate heat exchangers, pumping equipment, shut-off valves, ball valves, etc.
3. Installation of instrumentation and control equipment, electrical equipment.
4. Commissioning.
5. The device of additional openings for screw conveyors (according to RD, code BAMZ-68/22-KZ).
Performance of works on technical re-equipment of the boiler house with an installed capacity of 12.3 MW (SMR) Collapse
| Current | MANGAZEYA MINING LLC | 06.06.2024 12:00 |
Request for Proposals # 3680408
The lift is double-post electrohydraulic with lower synchronization at 380 V
Double-post electrohydraulic lift with lower synchronization at 380 V with installation and commissioning at the site of the GOK Nasedkino
| Current | MANGAZEYA MINING LLC | 05.06.2024 23:59 |
Request for Proposals # 3676637
Execution of works on the manufacture of high-pressure hoses (RVD) according to the declared catalog code and their installation on equipment at the Customer's site
Manufacturing of RVD sleeves
| Current | MANGAZEYA MINING LLC | 31.05.2024 12:00 |
Request for Proposals # 3676853
... Expand
Installation of automatic fire extinguishing systems at the facility: "Mining processing enterprise based on the gold deposit "Nasedkino". Reconstruction. The output capacity is 1.9 million tons per year."
Installation of automatic fire extinguishing systems Collapse
| Current | MANGAZEYA MINING LLC | 31.05.2024 12:00 |
Request for Proposals # 3676919
... Expand
Execution of works on the installation of heating networks and external water supply networks at the facility: "Mining processing enterprise based on the gold deposit "Nasedkino". Reconstruction. The output capacity is 1.9 million tons per year"
Execution of works on the installation of heating networks and external water supply networks Collapse
| Current | MANGAZEYA MINING LLC | 31.05.2024 12:00 |
Request for Proposals # 3679458
IZUT-000053
Corrugated pipe LMG 20.25, DN
2.0m, wall thickness 2.5mm, corrugation
150x50mm, useful section length
2100mm., hot zinc,
mounting elements.- 1660 p.m.
| Current | MANGAZEYA MINING LLC | 31.05.2024 12:00 |
Request for Proposals # 3677538
Control and measuring devices. Need (Customer) LLC Gold Baleya (ZBUT-000015).
Flow meter-counter electromagnetic "Take-off EM" Dn150 Ru2,5 - 4 pcs
| Current | MANGAZEYA MINING LLC | 30.05.2024 18:00 |
Request for Proposals # 3676573
DCUT-000560 and DCUT-000559 lighting devices and consumables for cable products
DCUT-000560 and DCUT-000559 lighting devices and consumables for cable products
| Current | MANGAZEYA MINING LLC | 30.05.2024 13:00 |
Request for Proposals # 3673013
Electrotechnical products according to the bids of DCUT-000446
Electrotechnical products according to the bids of DCUT-000446
| Archived | MANGAZEYA MINING LLC | 28.05.2024 12:30 |
Request for Proposals # 3678407
Steel sheet 06KHN28MDT 20mm GOST-5582-75 - 9 m2
Pipe 89*5.5 12H18N10T GOST 9941-81-0.6 tons
| Archived | MANGAZEYA MINING LLC | 28.05.2024 09:12 |
Request for Proposals # 3678066
Pipe b/w g/d 168x8 09G2S GOST 8732-78-
The total number of pipes is not less than 906 meters / without taking into account the coefficient for cutting.
| Archived | MANGAZEYA MINING LLC | 28.05.2024 09:00 |
Request for Proposals # 3676228
Komatsu Spare parts (Seat assembly) DCUT-000593
Komatsu Spare parts (Seat assembly) DCUT-000593
| Archived | MANGAZEYA MINING LLC | 27.05.2024 15:00 |
Request for Proposals # 3672669
... Expand
Control cabinet for fire-retaining valves SHU-CommercialProposal-NO-230P(D)-15 DCUT-000391 (UPDATE OF WORKING DOCUMENTATION)
Control cabinet for fire-retaining valves SHU-CommercialProposal-NO-230P(D)-15 DCUT-000391 (UPDATE OF WORKING DOCUMENTATION) Collapse
| Archived | MANGAZEYA MINING LLC | 27.05.2024 13:00 |
Request for Proposals # 3675508
... Expand
Delivery of the control panel and the control panel according to the bids of DCUT-000563 and DCUT-000591 (according to RD)
Delivery of the control panel and the control panel according to the bids of DCUT-000563 and DCUT-000591 (according to RD) Collapse
| Archived | MANGAZEYA MINING LLC | 27.05.2024 13:00 |
Request for Proposals # 3673737
Supply of switchboards and lighting panels according to the bid of DCUT-000033 (updated RD, final version)
Supply of switchboards and lighting panels according to the bid of DCUT-000033 (updated RD, final version)
| Archived | MANGAZEYA MINING LLC | 27.05.2024 12:30 |
Request for Proposals # 3673516
Delivery of shields and boxes on bids of DCUT-043-045-054-099-100-108-129-169( updated RD, final version)
Delivery of shields and boxes on bids of DCUT-043-045-054-099-100-108-129-169( updated RD, final version)
| Archived | MANGAZEYA MINING LLC | 27.05.2024 12:00 |
Request for Proposals # 3664647
PE100 pipe and fittings
PE100 pipe and fittings
| Archived | MANGAZEYA MINING LLC | 24.05.2024 12:00 |
Request for Proposals # 3670544
... Expand
Supply of switchboards according to the bid of DCUT-000477 (according to RD)
Supply of switchboards according to the bid of DCUT-000477 (according to RD)
Restarting the procedure in connection with the OL update
Supply of switchboards according to the bid of DCUT-000477 (according to RD)
Restarting the procedure in connection with the OL update Collapse
| Archived | MANGAZEYA MINING LLC | 24.05.2024 12:00 |